Large-Scale Execution Portfolio
Hyderabad-Vijayawada Expressway
Project Type
Expressway Thermoplastic Road Marking
Scope
50 kilometers of lane markings, edge lines, and directional arrows on high-speed expressway stretch
Challenge
Night traffic management and zero-tolerance quality audit requirements.
Execution
Deployed owned precision applicators and industrial boilers. Executed in three shifts to maintain traffic flow. Used Automark thermoplastic paint with glass bead surface application
Result
Zero safety incidents during execution. Passed client audit on first inspection. Reflectivity metrics exceeded IRC standards
Telangana State Highway Network
Project Type
Signboard and Shank Installation
Scope
Installation of 100+ signboards (3M brand) and median markers across multiple highway segments
Challenge
Monsoon season execution with tight deadlines
Execution
Core team of retired road building professionals led planning and deployment. Wind-resistant mounting systems used. Completed in weather windows
Result
On-time handover despite weather constraints. Zero rework required. Client commendation for execution efficiency
NHAI Highway Stretch
Project Type
Road Markers and Reflectors Deployment
Scope
Large-scale installation of road studs, reflectors, and delineators for enhanced nighttime safety
Challenge
Scale of deployment across extended stretch with precision placement requirements
Execution
Bulk material procurement. Full machinery deployment. Systematic sector-wise execution with quality control checkpoints
Result
Enhanced visibility metrics measured post-installation. Compliance documentation submitted and approved. Zero defect rate
GMR Infrastructure Subcontract
Project Type
Comprehensive Road Safety Execution
Scope
Thermoplastic markings, signboards, and road furniture installation for major infrastructure project
Challenge
Coordination with main contractor timelines and multi-location execution.
Execution
Dedicated project manager assigned. Real-time progress reporting. Flexible team deployment based on site readiness
Result
Seamless integration with main contractor schedule. Timely completion supporting overall project handover. Repeat business secured